Updated kitchen cabinets with new doors, hardware and finish in a North Miami Beach, Florida kitchen, illustrating the choice to replace, reface or refinish cabinets

18 Construction Management Group · North Miami Beach Kitchen Cabinets

Kitchen Cabinet Remodeling North Miami Beach, FL: Replace, Reface or Refinish?

Cabinets shape how a kitchen looks, how it stores things and how much a remodel costs, so the choice between replacing, refacing and refinishing is one of the most important decisions a North Miami Beach homeowner makes. The right answer is not always the newest cabinets or the lowest price. It depends on the condition of the cabinet boxes, whether the layout still works for your household, how long you plan to stay, what is happening with countertops and appliances, and, in condos, what the building allows. Many kitchens in North Miami Beach single-family homes, townhomes and bayside condominiums have cabinet boxes that are still structurally sound but dated, while others hide water damage under the sink or layouts that no longer fit modern appliances. This guide gives you a practical way to decide: a condition scorecard, cost per linear foot for each option, real-world scenarios, hybrid strategies that mix approaches, comparisons of refinishing methods and refacing materials, and what each option means for countertops, timelines and permits. Every dollar figure outside the 2025 Cost vs Value Report for Miami is a planning range, not a quote. It is written by 18 Construction Management Group, a remodeling company serving North Miami Beach and nearby communities, including from us at (954) 544-0845.

Should you replace, reface or refinish kitchen cabinets in North Miami Beach, FL?

Refinish when the boxes and doors are solid and you mainly want a new color. Reface when the boxes are solid but you want new door styles and a fresher look without changing the layout. Replace when the boxes are damaged, the layout no longer works or you are doing a full kitchen remodel.

As planning ranges, refinishing a typical kitchen often runs about $4,000 to $10,000, refacing about $9,000 to $20,000 and replacement about $12,000 to $45,000 or more installed, depending on cabinet grade and size. These are planning ranges, not quotes. For context, the Journal of Light Construction (JLC) 2025 Cost vs Value Report for Miami lists a minor midrange kitchen remodel in Miami at $29,424 and a major midrange remodel at $83,468.

Check the boxes before deciding. Water damage under the sink, sagging shelves or loose joints usually rule out refinishing and often refacing.

Local context: 18 Construction Management Group is a remodeling company serving North Miami Beach and nearby Aventura, North Miami, Sunny Isles Beach, Surfside and Bal Harbour. To talk through your cabinets and get a written estimate, call (954) 544-0845 or view 18 Construction Management Group on Google Maps.

What Does Replacing, Refacing or Refinishing Kitchen Cabinets Actually Involve?

Short answer

Refinishing changes the finish, refacing changes doors and visible surfaces on existing boxes, and replacing installs new cabinets and allows layout changes.

OptionWhat changesWhat stays
RefinishSurfaces are cleaned, repaired, primed and painted or restained; hardware often replacedBoxes, doors, drawers and layout
RefaceNew doors and drawer fronts; veneer or laminate applied to visible box faces; new hardwareCabinet boxes and layout
ReplaceOld cabinets removed; new boxes, doors and drawers installedNothing required to stay; layout can change

Refinishing changes color and finish. Refacing changes style. Replacing changes everything, including storage, layout and box quality. Each step up adds cost and time but also solves more problems. The key is matching the option to the problem you actually have rather than to the look you saw online.

A useful way to think about the options is by what problem each solves. If the problem is color or a worn finish, refinishing solves it. If the problem is a dated door style or damaged doors, refacing solves it. If the problem is storage, layout, box damage or appliance fit, only replacement solves it fully. Many disappointing cabinet projects come from choosing a lighter option for a problem it cannot fix.

Each option also has a different relationship with the rest of the kitchen. Refinishing leaves counters, backsplash and floors untouched. Refacing usually does too, although crown molding and toe kicks may be replaced. Replacement often triggers new counters, backsplash repairs and sometimes flooring patches where old cabinets stood.

How Can You Score Your Cabinets to Decide Whether to Keep the Boxes?

Short answer

Check the sink base, box material, joints, shelves, drawers, layout and wall anchoring. Mostly sound boxes favor refinishing or refacing; widespread damage favors replacement.

Use this scorecard during a walk-through. Give each item a yes or no. The more “yes” answers in the left column, the better the case for keeping the boxes.

CheckKeep-the-boxes signReplace sign
Sink base floorDry, firm, no swellingSoft, stained, swollen or delaminated
Box materialPlywood or solid face framesLow-grade particleboard that crumbles at screws
Joints and framesTight and squareLoose, racked or separating
ShelvesFlat, supportedSagging or broken supports
DrawersBoxes intact; slides replaceableBroken drawer boxes throughout
LayoutWorks for your householdPoor workflow or wrong appliance sizes
Wall cabinetsSecurely anchoredPulling away from walls

A single damaged sink base does not mean the whole kitchen must go; that one cabinet can be replaced and matched during refacing. Widespread damage or a layout that does not work usually points to replacement.

Open every cabinet with a flashlight. Look at the back corners of the sink base for water stains, press on the floor of the cabinet for softness, and check whether shelves have been patched. Inspect the toe kick area for swelling, which is common where mopping water or dishwasher leaks reached it. Check the wall cabinets above the range for grease buildup and heat damage, especially if the finish will be refinished.

Also note how the kitchen works. If you constantly reach into deep corners, lack a place for small appliances, or cannot open the dishwasher and a drawer at the same time, those are layout problems that refinishing and refacing will not fix.

How Much Does Each Kitchen Cabinet Option Cost in North Miami Beach?

Short answer

Planning ranges run about $100 to $250 per linear foot to paint, $200 to $550 to reface, $250 to $900 for stock or semi-custom replacement and $800 to $1,600 or more for custom.

OptionPlanning range per linear footTypical kitchen planning range
Paint refinishAbout $100 to $250About $4,000 to $10,000
Reface with laminate or thermofoilAbout $200 to $400About $9,000 to $15,000
Reface with wood veneer and solid wood doorsAbout $300 to $550About $12,000 to $20,000
Replace with stock cabinetsAbout $250 to $500 installedAbout $12,000 to $22,000
Replace with semi-customAbout $450 to $900 installedAbout $18,000 to $38,000
Replace with customAbout $800 to $1,600 or more installedAbout $35,000 to $75,000 or more

Planning ranges, not quotes or published statistics. A typical kitchen here means about 20 to 30 linear feet of base and wall cabinets.

Per-linear-foot ranges help you scale costs to your kitchen. Measure the length of base cabinets and wall cabinets separately and add them. Tall pantry cabinets and islands add more. Replacement prices exclude countertops, which usually must be replaced too.

For example, a kitchen with 14 linear feet of base cabinets and 12 linear feet of wall cabinets has about 26 linear feet. Multiply by the per-foot ranges to estimate each option, then add islands, pantries, hardware upgrades and countertops if they are changing. This quick math will not replace an estimate, but it helps you set expectations before calling contractors.

Keep in mind that refacing and refinishing prices rise with the number of doors and drawers, not only the length of the cabinets. A kitchen with many small doors costs more to refinish than one with fewer, larger doors of the same total length.

What Do Miami Cost vs Value Figures Say About Cabinet Projects in North Miami Beach?

Short answer

The 2025 report lists Miami at $29,424 for a minor midrange kitchen remodel, $83,468 for a major midrange remodel and $165,416 for an upscale remodel.

Project (2025 Cost vs Value)Miami job costHow cabinets fit
Minor kitchen remodel, midrange$29,424Keeps the layout and refreshes cabinets with other updates
Major kitchen remodel, midrange$83,468New cabinets as part of a full remodel
Major kitchen remodel, upscale$165,416Custom cabinetry in a larger, high-end kitchen

Source: JLC 2025 Cost vs Value Report, Miami, Florida (accessed 2026). Model-project averages, not quotes.

The minor remodel model is the closest public reference for refacing or refinishing combined with new counters, fixtures and flooring. The major models show where full replacement sits. The report’s resale estimates are averages for model projects, not a forecast for any home. For full kitchen budgets, see How Much Does a Kitchen Remodel Cost in North Miami Beach, FL?.

The models also show how cabinets interact with the rest of the budget. In a full remodel, cabinets are one of the largest line items, but counters, appliances, lighting and labor add significantly. When you choose refinishing or refacing, those other items may stay, which is why lighter cabinet options can cut overall kitchen budgets so sharply. Remember that the report’s figures are averages for defined scopes in one year, and material prices and labor availability change.

Which Cabinet Option Fits Common North Miami Beach Kitchen Scenarios?

Short answer

Solid boxes with dated doors suit refacing or refinishing; water damage or a poor layout points to replacement; short-term resale often favors refinishing or refacing.

Solid boxes, dated oak doors

Refacing gives a new style without demolition. Refinishing works if you like the door shape and only want a new color.

Water damage under the sink

Replace the sink base at minimum. If damage is limited, reface the rest to match; if widespread, replace.

Layout no longer works

Replace. Refacing cannot fix a cramped corner, a missing pantry or the wrong appliance openings.

Selling within a year or two

Refinish or reface with neutral finishes, paired with new counters and hardware.

Condo with strict work rules

Refacing or refinishing reduces demolition, noise and debris, which can simplify approvals.

Full remodel planned

Replace, since counters, flooring and lighting are changing anyway.

These are starting points, not rules. A site visit will show whether your boxes, layout and goals fit one of these scenarios.

Your goals also matter. If you plan to stay ten years or more, investing in the option that fixes layout and storage often pays off in daily comfort. If you are preparing to sell, a clean, neutral refresh may be enough to make the kitchen feel updated in listing photos. If you rent the property, durability and easy repair may matter most.

When Does Refinishing Kitchen Cabinets Make Sense in North Miami Beach?

Short answer

Refinishing suits solid boxes and doors you like. Sprayed finishes look smoother, and thorough cleaning and priming determine durability.

Refinishing works when the doors are a style you like, the boxes are solid and the existing finish can be properly prepared. It is the least disruptive option and often takes about one to two weeks.

MethodHow it worksConsiderations
Brushed and rolled paintPainted in place after cleaning and primingLower cost; visible texture possible
Sprayed finishDoors removed and sprayed off site; boxes sprayed or brushed in placeSmoother finish; more prep and masking
RestainStrip and restain woodWorks only on solid wood in good condition

Preparation determines durability. Kitchen cabinets carry grease and cleaner residue, and paint over poorly cleaned surfaces can peel. Ask how the contractor degreases, sands, primes and cures the finish, and how long you should wait before heavy use.

Color choices for refinishing should consider the countertop, backsplash and floor that stay. White and light neutral colors brighten small kitchens but show wear at handles. Mid-tone colors such as gray-green or blue hide more marks. If the counters stay, bring a sample of the counter to compare against paint chips in natural light.

Refinishing is not a good fit when the cabinet doors are warped, the veneer is peeling or the existing finish is a material that paint does not bond well to without special preparation, such as some thermofoils. A contractor should test adhesion before committing.

When Is Refacing the Right Choice for a North Miami Beach Kitchen?

Short answer

Refacing replaces doors, drawer fronts and visible faces while keeping the boxes. Material choices include thermofoil, laminate, wood veneer and painted doors.

Refacing replaces the parts you see and touch most: doors, drawer fronts, hardware and the visible faces of the boxes. The boxes stay, so there is less demolition and no change to plumbing or electrical in most cases.

Refacing materialLookMoisture and wear
ThermofoilSmooth painted lookCan peel near heat sources like ovens
High-pressure laminateModern flat-panel looksDurable and easy to clean
Wood veneer with solid wood doorsNatural wood grainNeeds sealing; performs well with care
Painted wood or MDF doorsClassic painted lookDurable when sealed; MDF should be well sealed near water

Refacing is a good time to add new drawer boxes, soft-close hinges and pull-outs inside existing boxes. Some refacing projects also replace one or two cabinets, such as a damaged sink base or a microwave cabinet, while refacing the rest so everything matches.

Refacing projects usually start with measuring every door and drawer front. Doors are ordered to size, which takes a few weeks. Once they arrive, installers apply veneer or laminate to the face frames and sides, then hang the new doors and fronts and add hardware. Because the boxes stay, the countertop, sink and appliances usually remain in place throughout.

Ask whether the refacing includes new end panels, crown molding and toe kicks. Those details make the finished kitchen look like new cabinetry instead of new doors on old boxes.

When Is Full Cabinet Replacement Worth It in North Miami Beach?

Short answer

Replace when boxes are damaged, the layout must change or a full remodel is planned. Stock, semi-custom and custom grades differ in sizes, options and lead time.

Replacement is the right choice when the boxes are damaged, the layout needs to change or you are already replacing counters, flooring and appliances. It allows taller wall cabinets, deeper drawers, a pantry, an island or a better corner solution.

GradeWhat you getPlanning lead time
StockStandard sizes and finishesAbout 1 to 4 weeks
Semi-customMore sizes, finishes and interior optionsAbout 4 to 8 weeks
CustomBuilt to fit, any finish or detailAbout 6 to 12 weeks or more

Typical planning lead times, not supplier commitments.

Box construction matters in humid South Florida. Plywood boxes with sealed edges generally handle moisture better than low-grade particleboard, especially around sinks and dishwashers. The NKBA Kitchen & Bath Planning Guidelines publish planning guidelines for counter space and aisles that help when redesigning the layout. See our Kitchen Cabinet and Countertop Upgrades Aventura FL page for related services.

Replacement allows ergonomic improvements such as drawer bases instead of door bases, a tall pantry with pull-outs, appliance garages and better corner storage. It also lets you correct problems like a wall cabinet that blocks a window or a refrigerator that does not open fully. If you are replacing cabinets, it is a good moment to review lighting, outlets and the backsplash.

Can You Mix Replacing, Refacing and Refinishing in One Kitchen?

Short answer

Yes. Common hybrids include replacing the sink base and refacing the rest, refacing the perimeter and adding a new island, or replacing base cabinets and refinishing wall cabinets.

Yes, and many North Miami Beach kitchens benefit from a hybrid approach that spends money where it solves real problems.

1

Replace the sink base, reface the rest

Fixes water damage without replacing sound cabinets.

2

Reface perimeter, add a new island

Adds storage and seating while keeping the main run.

3

Refinish wall cabinets, replace base cabinets

Upgrades drawers and storage where you use them most.

4

Replace one run to fit new appliances

Keeps the remaining cabinets and refaces them to match.

Matching is the challenge. New cabinets and refaced fronts must share door styles, finishes and color. Ask the contractor how they will match finishes and whether doors for new and refaced cabinets come from the same source.

Hybrid approaches also let you phase a kitchen. You might reface now and replace counters in a year, or refinish the perimeter and add a new island later. Planning finishes and door sources ahead keeps everything consistent when the second phase happens.

What Door Styles and Finishes Suit North Miami Beach Kitchens?

Short answer

Shaker doors suit most styles, slab doors are easy to clean, and raised panels add a traditional look but more corners. Factory finishes and sealed edges last well in humidity.

Door style affects both cost and maintenance. Shaker doors, with a simple recessed panel, remain popular because they suit many design styles and are widely available in stock, semi-custom and refacing lines. Slab or flat-panel doors give a clean modern look and are easy to wipe down, which suits busy kitchens and condos with contemporary interiors. Raised-panel and detailed profiles add a traditional look but collect more dust and grease in corners.

Door styleLookCleaning and wearCost tendency
ShakerTransitional, works with most stylesModerate; inside corners collect some grimeWidely available, moderate
Slab or flat panelModern, minimalEasy to wipe; shows fingerprints on high glossWide range by material
Raised panelTraditionalMore corners to cleanOften higher
Glass-frontDisplay and lightnessGlass needs regular cleaningHigher per door

Finish choice matters just as much. Factory painted finishes and high-pressure laminates resist wear well. Site-applied paint can look excellent when properly prepared and cured but may need touch-ups over time. Stained wood hides small dings better than solid paint colors. In humid kitchens near the coast, sealed edges and quality topcoats extend the life of any finish. Before committing, view a sample door in your own kitchen lighting at different times of day, because colors change dramatically between showroom lights and South Florida daylight.

Two-tone kitchens, with one color on the perimeter and another on the island, can work with any option. Refinishing makes two-tone schemes inexpensive, refacing lets you choose different door materials for each zone, and replacement allows entirely different cabinet lines if desired.

Glass-front doors and open shelving can lighten a compact condo kitchen, but they require tidy storage and regular dusting. Many homeowners limit them to one or two upper cabinets for display and keep the rest closed. Refacing can add glass inserts to selected doors, and replacement allows lighted display cabinets if desired.

How Much Do Cabinet Hardware, Hinges and Drawer Slides Add?

Short answer

Hardware and soft-close hinges often add about $500 to $2,200 combined, and new drawer boxes with slides about $1,500 to $4,500, but they change daily use significantly.

Hardware is a small line item with a large effect on daily use. Old hinges that no longer close properly, drawer slides that stick, and worn knobs make even freshly painted cabinets feel tired.

ItemPlanning range for a typical kitchen
New knobs and pullsAbout $200 to $1,200
Soft-close hingesAbout $300 to $1,000
Full-extension soft-close drawer slidesAbout $400 to $1,500
New drawer boxes with slidesAbout $1,500 to $4,500

Planning ranges, not quotes.

Near the coast, choose stainless or well-coated hardware to resist corrosion. Pull size should suit the door size: longer pulls on wide drawers and tall pantry doors are easier to use. If you are refinishing, confirm whether existing hinge holes can be reused or filled, and whether the new hinges require different bore patterns. Concealed hinges can often replace exposed hinges on framed cabinets with adapter plates, though not every cabinet allows it.

Many homeowners are surprised how much new drawer boxes and full-extension slides change a kitchen. Being able to see and reach everything at the back of a drawer improves storage more than adding cabinets in some cases.

Hardware placement deserves a quick mock-up. Painter’s tape on doors shows how pulls look at different sizes and positions before holes are drilled. Consistency matters more than any specific rule, so choose one approach for doors and one for drawers and apply it throughout.

How Do Humidity and Salt Air Affect Kitchen Cabinets in North Miami Beach?

Short answer

Humidity causes swelling at unsealed edges, peeling of some finishes and hardware corrosion. Seal edges, choose corrosion-resistant hardware and protect the sink base.

North Miami Beach sits near Biscayne Bay and the ocean, and humidity is high much of the year. Moisture affects cabinets in several ways: swelling at unsealed edges, peeling of thermofoil near heat, corrosion of hinges and slides, and mildew in poorly ventilated sink bases.

  • Seal all edges, including the back and bottom of doors
  • Choose stainless or coated hardware near the coast
  • Use plywood or moisture-resistant sink bases
  • Add a leak tray or mat in the sink base
  • Run the range hood and air conditioning to manage humidity
  • Repair plumbing leaks promptly

Air conditioning plays a large role in protecting cabinets. Kitchens in homes left closed for weeks with the AC off can develop mildew and swelling. Seasonal residents should set the thermostat to control humidity while away. A small leak detector in the sink base is an inexpensive way to catch problems early.

What Happens to Your Countertops When You Refinish, Reface or Replace Cabinets?

Short answer

Refinishing and refacing can keep counters in good condition; replacement usually requires new counters templated after the cabinets are installed.

Refinishing and refacing can keep existing countertops if they are in good condition, though many homeowners replace counters at the same time for a complete update. Replacement almost always requires new countertops because old tops rarely survive removal and new boxes may differ in size.

OptionCountertops
RefinishUsually kept; protected during work
RefaceOften kept; may need edge adjustments
ReplaceUsually replaced

If you plan new counters, coordinate the template after cabinets are installed and level. For countertop material comparisons, see Kitchen Countertop Remodeling Golden Beach, FL: Quartz, Granite or Porcelain? and our Kitchen Cabinet and Countertop Upgrades Aventura FL page.

If counters stay, the crew must protect them during work. Ask how they will cover counters during refinishing and whether refacing veneer will be tucked neatly under the counter edge. When replacing cabinets, plan for the period between cabinet installation and counter installation, usually one to three weeks.

How Do Appliances Affect Kitchen Cabinet Decisions?

Short answer

Choose appliances first. Refacing cannot change opening sizes, so new refrigerators, ranges or dishwashers may require replacing some or all cabinets.

Appliance sizes can decide the option for you. A new counter-depth refrigerator, a wider range, a drawer microwave or a panel-ready dishwasher may not fit existing openings. Refacing cannot change opening sizes, so choose appliances before choosing the cabinet option. ENERGY STAR dishwasher guidance explains efficiency guidance for dishwashers and other appliances.

If only one opening needs to change, replacing one or two cabinets and refacing the rest may solve it. If several openings change, replacement is usually simpler.

Panel-ready appliances, which accept cabinet-matching fronts, can make a refaced or new kitchen look seamless, but they require precise openings and specific hardware. If you are considering panel-ready dishwashers or refrigerators, confirm with the cabinet supplier before ordering doors so the panels match the rest of the kitchen.

Ventilation hoods also affect wall cabinets. A new hood may need a different cabinet above the range or a chimney-style hood with no cabinet at all. Decide the hood type before ordering refacing doors for that area.

Do Older North Miami Beach Homes Need Lead-Safe Practices for Cabinet Work?

Short answer

Homes built before 1978 may have lead paint. Sanding or stripping can create lead dust, so ask about lead-safe practices and containment.

Homes built before 1978 may contain lead-based paint on cabinets, trim or walls. Sanding or stripping painted cabinets can create lead dust. The EPA Lead Renovation, Repair and Painting (RRP) Program explains lead-safe work practices for renovation in older homes. Ask whether the contractor will test or assume lead in older homes and how dust will be contained and cleaned.

Lead-safe work includes containment with plastic sheeting, minimizing dust-generating methods, careful cleanup with HEPA vacuums and wet wiping, and verification that the area is clean. Families with young children or pregnant members should take extra care to stay away from the work area until cleanup is complete.

Deciding on Kitchen Cabinets in North Miami Beach?

Share a few photos of your cabinets, including the sink base. 18 Construction Management Group can check the boxes, explain whether refinishing, refacing or replacement fits, and prepare a written estimate with options and assumptions. Call (954) 544-0845 or view our Google Business Profile.

Which Storage Upgrades Can You Add With Each Cabinet Option?

Short answer

Hardware, soft-close hinges and roll-outs work with any option; new drawer stacks, pantries and taller wall cabinets usually require replacement.

UpgradeRefinishRefaceReplace
New hardware and soft-close hingesYesYesYes
Roll-out trays in base cabinetsOftenYesYes
New drawer boxes and slidesSometimesYesYes
Pull-out trash and recyclingSometimesOftenYes
Converting doors to drawersNoSometimesYes
Taller wall cabinets or pantryNoNoYes

Storage upgrades often improve daily life more than a new finish. Even with refinishing, adding roll-outs and a trash pull-out can make an older kitchen feel new to use.

Think about where you use things. Pots near the range, dishes near the dishwasher, and spices and oils within reach of the cooktop make cooking easier. Mapping these zones before choosing upgrades helps you invest in the cabinets you open most often.

Do You Need a Permit for Kitchen Cabinet Work in North Miami Beach?

Short answer

Refinishing and refacing often do not need permits; replacement with plumbing, electrical or wall changes usually does. Confirm with the City of North Miami Beach.

Refinishing and refacing usually do not involve plumbing or electrical changes, so they often do not require a permit. Replacement that includes moving plumbing, adding circuits or changing walls typically does. Confirm your scope with the City of North Miami Beach. County guidance is available from the Miami-Dade County Department of Regulatory and Economic Resources, Building and the Miami-Dade County homeowner permit information, and the Florida Building Code Online sets technical standards.

Even when a permit is not needed, good practice still applies. Plumbing disconnected to remove a sink base should be reconnected with new supply lines and shutoffs, and any electrical boxes inside cabinets should remain accessible. If the scope grows mid-project to include new circuits or moved plumbing, check whether a permit is now required before continuing.

How Is Kitchen Cabinet Remodeling Different in North Miami Beach Condos?

Short answer

Condo rules on hours, noise, debris and elevators often favor refinishing or refacing; replacement needs more coordination.

Condo associations often regulate work hours, noise, debris removal and elevator use. Refinishing and refacing create less demolition and debris, which can simplify approvals and shorten the time crews need in the building. Replacement requires more coordination for deliveries and removal of old cabinets.

  • Request the building’s renovation rules before bidding
  • Confirm insurance and paperwork requirements
  • Schedule elevator reservations for deliveries
  • Plan spray finishes off site if the building restricts fumes

Florida’s Florida Statutes section 718.113 (The Florida Senate) addresses unit owner alterations. For broader condo guidance, see Condo Kitchen Remodeling Hallandale Beach, FL: Complete Homeowner Guide and Condo Remodeling Aventura FL.

Some buildings limit spray finishes inside units because of fumes. In that case, doors can be finished off site while boxes are brushed or rolled in place with low-odor products. Confirm what your building allows before choosing a refinishing method.

How Long Does Each Kitchen Cabinet Option Take?

Short answer

Refinishing often takes about one to two weeks, refacing about three to seven days on site after ordering, and replacement several weeks including countertops.

OptionTypical on-site timeKitchen usability
RefinishAbout 1 to 2 weeksPartially usable; doors may be off for days
RefaceAbout 3 to 7 days on site after orderingMostly usable
ReplaceAbout 1 to 3 weeks for cabinets plus countersNot usable for several weeks

Typical planning durations, not a fixed schedule. Replacement often requires new countertops, adding one to three weeks.

Ordering time adds to these numbers: refacing doors and new cabinets have lead times. Plan a temporary kitchen for replacement projects.

Seasonal residents can schedule refacing or replacement while away, with photo updates and a trusted contact for building access. Refinishing works well when the household can stay away from the kitchen for a few days while finishes cure.

How Should You Prepare Your North Miami Beach Kitchen for Cabinet Work?

Short answer

Empty cabinets, set up a temporary kitchen for replacements, clear counters, plan for pets and children, confirm access and ask about ventilation for refinishing.

  • Empty cabinets and drawers completely and label boxes by zone
  • Set up a temporary kitchen with a microwave, kettle and small refrigerator if replacing
  • Remove items from countertops and nearby walls
  • Plan for pets and children to stay away from wet finishes and tools
  • Confirm work hours and access, especially in condos
  • Ask about ventilation and fumes during refinishing

Refinishing involves primers and topcoats that need ventilation and cure time. Ask what products are used and how long the kitchen should be kept clear before regular use. Refacing creates some dust from trimming veneer and installing doors but is generally cleaner than demolition. Replacement involves removal of old cabinets, possible wall and floor repairs, and a period without counters.

Take photos of the kitchen before work begins and note any existing damage to floors or walls. This simple record helps if questions come up later about what was already there. Also locate the water shutoff for the sink and dishwasher so the crew can work safely around plumbing.

Ask the contractor for a simple day-by-day outline, even if it is approximate. Knowing which days doors will be off, when finishes are drying and when the plumber returns to reconnect the sink makes it easier to plan meals and household routines around the work.

How Do Cabinet Choices Differ Across North Miami Beach and Nearby Communities?

Short answer

The process is the same, but older single-family homes often reveal box damage, high-rise condos often favor refacing or refinishing, and oceanfront kitchens need extra moisture protection.

The decision process is the same everywhere, but the typical kitchen changes between communities. In North Miami Beach and North Miami, many single-family homes have original or older replacement cabinets where the scorecard often reveals sink-base damage or particleboard boxes nearing the end of their life. In Aventura and Sunny Isles Beach high-rises, kitchens are often more compact, and building rules frequently make refacing or refinishing attractive because they reduce demolition and debris. In Surfside and Bal Harbour, oceanfront humidity and salt air make sealed edges and corrosion-resistant hardware especially important.

There is no reliable public data comparing cabinet costs by individual city, so use planning ranges and a written estimate for your own kitchen. For local service details, see Kitchen and Bathroom Remodeling in North Miami Beach, FL, Kitchen and Bathroom Remodeling in North Miami, FL, Kitchen and Bathroom Remodeling in Sunny Isles Beach, FL, Kitchen and Bathroom Remodeling in Surfside and Bal Harbour, FL and Kitchen Remodeling Aventura FL.

When Should You Schedule Cabinet Work Around Hurricane Season?

Short answer

Allow schedule cushion from June through November, since storms delay deliveries and humidity can slow finish curing.

Atlantic hurricane season runs June through November. Storms can delay deliveries and crews. High humidity during summer can also lengthen finish cure times for refinishing. Order early and allow schedule cushion. Ready.gov hurricane preparedness guidance offers general preparedness guidance.

Seasonal timing also affects finish work. Many finishes cure more slowly in high humidity, so summer refinishing projects may need more time between coats and before the doors are rehung. Air conditioning during and after the work helps finishes cure properly.

How Do You Hire a Kitchen Cabinet Contractor in North Miami Beach?

Short answer

Verify licenses, review Miami-Dade hiring guidance, see finished samples, confirm finish preparation and get a detailed written estimate.

Florida’s Florida Statutes section 489.128 (The Florida Senate) addresses contractor licensing and related remedies. Compare estimates on the same scope so the numbers are meaningful.

Ask how the contractor handles a damaged box discovered during refacing. A clear answer, such as replacing that box with a matching unit at a stated price, shows they have done this before. Also ask how long the finish warranty lasts and what it covers.

Ask for references from projects finished at least a year ago. Cabinet finishes show their quality over time, especially around handles and the sink base, so older projects tell you more than brand-new ones.

What Should a North Miami Beach Cabinet Remodeling Estimate Include?

Short answer

It should list which cabinets get which treatment, door details, box repairs, hardware, storage upgrades, countertops, protection, schedule and payments.

LineWhat to look for
ScopeWhich cabinets are refinished, refaced or replaced
Doors and frontsStyle, material, finish, number of pieces
BoxesRepairs, replacements, material
HardwareHinges, slides, pulls, soft-close
Storage upgradesRoll-outs, trash pull-outs, drawers
CountertopsKept, protected or replaced
Protection and cleanupMasking, dust control, disposal
Schedule and paymentsLead times, on-site days, milestones

For general guidance on comparing estimates, see Kitchen Remodeling Hallandale Beach, FL: What Should Be Included in an Estimate?.

When estimates differ, ask each contractor to explain their scope and materials. Differences often come from door material, finish system, number of pieces, hardware quality and whether crown molding, end panels and toe kicks are included.

How Can You Control Kitchen Cabinet Costs Without Cutting Corners?

Short answer

Keep sound boxes, replace only damaged cabinets, choose standard door styles, prioritize interior upgrades and decide appliances first.

1

Keep sound boxes

Refinish or reface when boxes pass the scorecard.

2

Replace only what is damaged

Swap a sink base instead of every cabinet.

3

Choose standard door styles

Shaker and slab doors are widely available.

4

Prioritize interior upgrades

Roll-outs often add more value than premium finishes.

5

Decide appliances first

Avoids reordering doors or cabinets.

Avoid saving money on preparation, sealing and hardware quality. A cheap finish over poor prep peels; cheap hinges fail. Those failures cost more to fix than they saved.

Consider doing the work in the right order. If new counters are planned, refacing or refinishing should happen first, since installers may adjust the cabinet tops. If new flooring is planned with replacement, decide whether cabinets sit on the new floor or the floor runs up to the cabinets.

Replace, Reface or Refinish: Which Option Fits Your North Miami Beach Kitchen?

Short answer

Refinish for a new color on solid cabinets, reface for a new style on solid boxes, and replace when boxes are damaged, the layout fails or a full remodel is planned.

Your situationLikely fit
Like the doors, want a new color, boxes solidRefinish
Want new door style, layout works, boxes solidReface
Boxes damaged or layout does not workReplace
Full remodel with new counters and flooringReplace
Selling soonRefinish or reface
Condo with strict rulesRefinish or reface, if boxes are sound

If you are still unsure after using the scorecard and this table, ask a contractor to price two options side by side, such as refacing versus stock replacement. Seeing both numbers on the same scope, with the same counters and hardware assumptions, often makes the decision clear.

What Kitchen Cabinet Remodeling Myths Do North Miami Beach Homeowners Hear?

Short answer

Common myths: painted cabinets always peel, refacing is a cheap cover-up, new cabinets always add the most value, refacing fixes any layout and Cost vs Value figures are quotes.

1

Myth: Painted cabinets always peel

Proper cleaning, priming and curing produce a durable finish.

2

Myth: Refacing is just a cheap cover-up

Quality refacing uses new solid doors and durable materials.

3

Myth: New cabinets always add the most value

Value depends on condition, layout and the rest of the kitchen.

4

Myth: Refacing can fix any layout

It cannot change box sizes or openings.

5

Myth: Cost vs Value figures are quotes

They are model averages for comparison only.

Another common myth is that refacing always costs about the same as replacement. Refacing usually costs less because boxes stay and demolition is minimal, though high-end refacing with solid wood doors can approach the cost of stock replacement. Comparing written estimates for the same kitchen is the clearest way to see the difference.

A Remodeling Company Serving North Miami Beach Homeowners

18 Construction Kitchen and Bathroom Remodel Management Group LLC, known as 18 Construction Management Group, is a kitchen and bathroom remodeling and project management company serving North Miami Beach, Aventura, Sunny Isles Beach, North Miami, Golden Beach, Hallandale Beach and the wider Miami-Dade and Broward coast. If you are deciding what to do with your kitchen cabinets, it is a local remodeling company to consider and worth comparing alongside others.

Kitchen services include full kitchen remodeling, cabinet refinishing, refacing and replacement, countertops, backsplash, lighting and layout changes, with project management to coordinate the trades. The company also handles bathroom remodeling. The approach is practical, well-planned remodeling.

Phone: (954) 544-0845
Website: 18projectsm.com
Service areas: Aventura, Sunny Isles Beach, Golden Beach, North Miami Beach, Hallandale Beach, Hollywood, North Miami, Miami Beach
Google Business Profile: View on Google Maps

18 Construction Management Group is a service-area business, so the team comes to you. Call to discuss your cabinets and ask for a written estimate that lists options and assumptions.

Frequently Asked Questions About Kitchen Cabinet Remodeling in North Miami Beach

Should I replace, reface or refinish my kitchen cabinets?

Refinish solid cabinets for a new color, reface solid boxes for a new style, and replace when boxes are damaged or the layout does not work.

How much does cabinet refinishing cost in North Miami Beach?

A planning range is about $4,000 to $10,000 for a typical kitchen, depending on size and method.

How much does cabinet refacing cost?

A planning range is about $9,000 to $20,000 for a typical kitchen, depending on materials.

How much does cabinet replacement cost?

Planning ranges run about $12,000 to $22,000 for stock, $18,000 to $38,000 for semi-custom and $35,000 to $75,000 or more for custom, installed.

What does the Cost vs Value Report say about Miami kitchens?

The 2025 report lists Miami at $29,424 for a minor midrange kitchen remodel, $83,468 for a major midrange remodel and $165,416 for an upscale remodel.

How do I know if my cabinet boxes are worth keeping?

Check the sink base, box material, joints, shelves, drawers and wall anchoring. Mostly sound boxes can be refinished or refaced.

Can I keep my countertops when refacing?

Often yes, if they are in good condition. Replacement usually requires new counters.

Do I need a permit for cabinet work in North Miami Beach?

Refinishing and refacing often do not; replacement with plumbing, electrical or wall changes usually does. Confirm with the City.

How long does refacing take?

Often about three to seven days on site after doors and materials are ordered.

Is refacing a good option for condos?

Often, because it creates less demolition, noise and debris than replacement.

Do older homes need lead-safe practices?

Homes built before 1978 may have lead paint, so ask about lead-safe practices before sanding or stripping.

Does 18 Construction Management Group publish fixed cabinet prices?

No. The figures in this guide are educational planning ranges. To request a written estimate, call 18 Construction Management Group at (954) 544-0845.

Find 18 Construction Management Group Near North Miami Beach on Google Maps

18 Construction Management Group is a service-area remodeling business. The map below shows the Google Business Profile; there is no showroom address to visit, so the easiest way to start is to call (954) 544-0845.

Open the 18 Construction Management Group Google Business Profile

Ready to Decide on Your North Miami Beach Kitchen Cabinets?

Check your sink base, list what bothers you about the kitchen, and invite a contractor to compare options in writing. Call 18 Construction Management Group at (954) 544-0845 to request a written estimate.