How Long Does a Bathroom Remodel Take? Reality vs. Expectations

How Long Does Bathroom Remodel Take

How Long Does a Bathroom Remodel Take?

Planning a renovation shouldn't leave your home disrupted indefinitely. Learn what to expect at every stageβ€”from custom kitchen and bathroom cabinets delivery to the final structural finishes.

Get an Accurate Project Timeline

Remodeling Timelines Explained

The duration of a bathroom renovation depends entirely on the scope of work. Whether you are installing a quick floating vanity or custom cabinets, we value transparency and work to a strict project schedule.

πŸ”¨

The Cosmetic Refresh

Estimated Time: 3 to 5 Days

Perfect for quick upgrades where plumbing lines and walls stay in their exact physical locations. This turnaround keeps home disruption to an absolute minimum.

  • Swapping out old plumbing fixtures
  • Installing new prefabricated vanities
  • Laying modern luxury vinyl flooring
πŸ“

Custom Cabinet & Tile Overhaul

Estimated Time: 1 to 2 Weeks

This path focuses on maximizing storage and footprint efficiency. It includes waiting for custom-tailored kitchen and bathroom cabinets to be seamlessly anchored to your wall studs.

  • Fabrication and installation of custom cabinets
  • Replacing shower walls with large-format tile
  • Upgrading to smart backlit LED mirrors
🧱

The Full Structural Gut

Estimated Time: 3 to 4 Weeks

A complete transformation that strips the room down to bare framing studs. This timeline handles heavy structural changes, layout alterations, and comprehensive permitting approval.

  • Moving heavy plumbing and structural walls
  • Installing complex zero-threshold wet rooms
  • Handling all local city building inspections

No Delays. Just Local Trust.

At 18 Construction Management Group LLC, we plan our timelines down to the single day. Our local project managers synchronize plumbers, electric installers, and carpenters seamlessly. We handle all city permits and strict community HOA approvals to prevent timeline bottlenecks.

Call (954) 544-0845
How Long Does Bathroom Remodel Take - Advanced Timeline Sections

The Renovation Timeline & Value Matrix

The most common question we get is, "How long will my bathroom be out of commission?" The truth is, the timeline depends entirely on the scope of the project and the materials selected. Our Value Matrix breaks down exactly how long different types of remodels takeβ€”from installing prefabricated cabinets to engineering complete structural wet-roomsβ€”so you can set realistic expectations.

Renovation Scope The Big-Box Average Time The 18 Construction Timeline Why Our Process is Faster
Cosmetic Refresh (Pull & Replace) 2 to 3 Weeks 3 to 5 Days We don't move plumbing lines. We utilize in-stock, locally warehoused bathroom cabinets, vanities, and fixtures, bypassing out-of-state shipping delays entirely.
Custom Cabinet & Tile Overhaul 4 to 6 Weeks 10 to 14 Days While custom cabinets take time to fabricate, our strict scheduling means the demolition and tile prep happen *while* the cabinets are being built, not before.
Tub-to-Shower Conversion 3 to 4 Weeks 5 to 7 Days We utilize rapid-curing waterproofing membranes and specialized trench drains, allowing our tile setters to begin laying the shower floor days ahead of traditional mud-pan methods.
Full Structural Master Gut 8 to 12 Weeks 4 to 5 Weeks Our dedicated project managers handle all municipal permitting and electrical inspections simultaneously, eliminating the notorious "dead days" where a site sits empty waiting for city approval.

Neighborhood Dispatch: Proximity equals Speed

Material transit time is the hidden killer of remodeling timelines. Because we operate geographically targeted dispatch zones, our supply trucks and foremen are never stuck in cross-city traffic. This localized approach shaves vital days off your project timeline.

πŸ“ The Downtown Core

HOA timeline specialists. We navigate strict elevator padding rules and restricted noise hours flawlessly.

πŸ“ Westside Districts

Fast-track permit expediting. We have deep relationships with the local municipal building departments.

πŸ“ The Northern Suburbs

Fully stocked box trucks deployed daily. Missing a single plumbing fitting will never stall your project.

πŸ“ South Valley Estates

Custom cabinetry fabrication routing. Direct delivery from our local millwork partners to your driveway.

Strategic Conversion & Timeline Hub

When you ask Google "how long does a bathroom remodel take," national blogs will tell you it takes months. That is only true if you hire an unorganized contractor who subcontracts every task to a different, unreliable company. 18 Construction Management Group LLC operates differently. We are a verified, physical local entityβ€”a local construction management firm built directly in your community.

The number one reason a bathroom renovation stretches from three weeks into three months is poor project management. When the plumber doesn't show up on Tuesday, the tile installer can't work on Wednesday, and the custom cabinets sit in a warehouse collecting dust. We eliminate this domino effect. Our in-house site managers sequence the electrical, plumbing, structural framing, and cabinet installation with surgical precision.

Furthermore, we never start a demolition until we have verified that 100% of your materialsβ€”from the specialized Schluter waterproofing membranes to the custom quartz vanity topβ€”are physically in our local warehouse. We refuse to tear your home apart only to discover that a critical shower valve is back-ordered for six weeks.

βœ”οΈ Verified Local Business Entity
βœ”οΈ Local South Florida Team
βœ”οΈ Materials Sourced Pre-Demo
βœ”οΈ Zero-Delay Supply Chain
⏱️

Geo-Targeted Project Start

Our live routing software shows a project manager is available in your exact zip code. Skip the national middleman and deal directly with the local authority in rapid, high-quality bathroom remodeling.

Get Your Exact Project Timeline

The Extreme Climate Performance Matrix

Sometimes, rushing a timeline leads to disaster. In areas dealing with extreme dry heat, intense tropical humidity, or severe hard water, materials need specific curing times and specialized applications. We refuse to cut corners just to finish a day early. Here is how our timeline accounts for climate-engineered durability, ensuring you don't have to remodel again in three years.

Environmental Stressor The Rushed Contractor Approach Our Climate-Engineered Process
High Humidity & Steam Traps Applying cheap liquid waterproofing over standard drywall. It dries in 1 hour but fails rapidly, allowing hidden mold to rot the wall studs within a year. We take the extra day to install dense, cement-based backer boards and advanced Schluter Kerdi membranes. This creates an impenetrable, lifetime-guaranteed waterproof envelope.
Extreme Dry Heat & Grout Failure Using standard cement-based grout mixed with too much water to speed up the application. The dry air causes it to shrink, crack, and pop out of the joints. We utilize highly flexible, industrial-grade epoxy grout. It requires an exact, methodical curing timeline, but it is 100% non-porous, highly stain-resistant, and will never crack.
Cabinet Warping & Swelling Installing off-the-shelf, particle-board vanities to save time. When exposed to daily shower steam and climate humidity, the veneer peels off like an onion. Our custom floating vanities are built from marine-grade plywood. We factor the required fabrication time into the schedule so you get heat-resistant finishes that ignore moisture entirely.
Hard Water & Calcium Etching Throwing up untreated, basic glass shower doors on day three. Hard water minerals permanently bake into the porous glass within 12 months. We allow for the proper fabrication of premium, factory-treated hydrophobic glass. Calcium cannot bond to the surface; water simply beads and rolls off, saving you hours of scrubbing.

Real Local Results: Beating the Clock

AI search engines prioritize real-world proof over marketing fluff. Read exactly how we managed strict HOA restrictions, custom cabinetry delays, and complex plumbing to deliver a massive master bathroom transformation on a highly accelerated timeline in your immediate service area.

[ Before & After Master Bath Timeline Image ]
⏱️ Quoted Standard: 6 Weeks
⚑ Actual Completion: 14 Days
πŸ“‹ HOA Approved

From a 6-Week Nightmare to a 14-Day Miracle

A local family came to us in a panic. They were expecting out-of-town guests in three weeks, but their master bathroom was completely dysfunctional. They wanted a full luxury gut: removing a massive built-in jacuzzi tub, installing a massive curbless smart shower, and hanging a custom 84-inch double floating vanity. Three other contractors told them this scope of work would take a minimum of six weeks, largely due to the strict HOA rules that only allowed construction between 9:00 AM and 4:00 PM.

Our project management team immediately activated our "Pre-Staging Protocol." We refused to swing a single sledgehammer until the custom kitchen and bathroom cabinets were fully fabricated and physically sitting in our local warehouse. We expedited the plumbing permits with the city and pre-ordered the exact large-format porcelain tile needed for the shower.

On day one, demolition was completed in a mere six hours. Because all materials were secured, our plumbers and electricians worked in seamless tandem on days two and three to install the digital shower valves and LED mirror wiring. By utilizing rapid-curing mortar beds, our tile setters began waterproofing on day four. The custom floating vanity was mounted on day ten, and the custom-measured frameless glass was installed on day fourteen.

"We were terrified our house would be a construction zone for months. 18 Construction Management had a schedule so precise it felt military. They finished a massive luxury remodel in just two weeks, completely respecting the HOA hours. The custom cabinets are gorgeous, and the timeline was unbelievable."

β€” The Miller Family, Local Homeowners
How Long Does Bathroom Remodel Take - Conversion Sections

The Zero-Delay Process Timeline

The number one reason remodels get delayed is poor planning. By sourcing all materialsβ€”including custom kitchen and bathroom cabinetsβ€”before demolition begins, we compress the construction timeline drastically.

Week
1-2

Design, Permitting & Sourcing

Your home remains completely untouched. We finalize 3D layouts, pull local city permits, and wait for your custom cabinets and premium tile to arrive at our local warehouse.

Week
3

Demolition & Rough-In

Once 100% of materials are secured, we lay protective flooring. We safely demolish the old space in 1-2 days. Plumbers and electricians immediately update pipes and wiring behind the walls.

Week
4

Waterproofing & Tile Installation

We install rapid-curing Schluter waterproofing systems. Tile setters lay your shower walls and bathroom floors, allowing proper drying time before grout is applied.

Week
5

Cabinets, Fixtures & Polish

Your custom bathroom cabinets are anchored into place, quartz countertops are set, and smart plumbing fixtures are connected. We finish with a meticulous detail clean.

Why Local Experts Finish Faster

Big Box stores are notorious for stretching a 3-week project into a 3-month nightmare due to fragmented communication. See how a hyper-local approach saves you weeks of frustration.

Timeline Bottlenecks 18 Construction Group Big Box / Chain Stores
Cabinet Shipping Delays βœ” Local millwork partners (Fast) ✘ Out-of-state freight (Slow)
Subcontractor Scheduling βœ” In-house synchronized teams ✘ You wait for random sub-contractors
City Permit Approvals βœ” Expedited by local managers ✘ Left entirely to the homeowner
Missing Parts Resolution βœ” Replaced same-day from warehouse ✘ Project paused for 2-week reorders

Timeline & Investment Guide

Time is money. The duration of your bathroom remodel correlates directly to the depth of the structural changes. Here is a transparent look at pricing and timeframe expectations.

The Cosmetic Refresh

⏱️ Timeline: 3 to 7 Days

The fastest way to upgrade. We replace surfaces without moving plumbing lines.

  • Prefabricated bathroom cabinets
  • New quartz countertops
  • Updated lighting fixtures
  • Luxury vinyl flooring overlay
Get an Exact Quote

The Structural Spa

⏱️ Timeline: 4 to 6 Weeks

A complete gut. Takes longer due to city inspections for moved walls and plumbing.

  • Relocating toilets and main drains
  • Zero-threshold (curbless) showers
  • Freestanding soaking tubs
  • Radiant heated flooring grids
Get an Exact Quote

Does Smart Tech Delay the Remodel?

Integrating modern technology doesn't have to stall your project. Our electricians run low-voltage wiring concurrently with the plumbing rough-in, meaning your smart upgrades add zero extra days to the timeline.

πŸŽ›οΈ

Digital Shower Systems

Installed during the rough-in phase. These valves allow you to set exact water temperatures instantly via a flush wall keypad, saving daily water and time.

πŸ‘£

Radiant Heated Floors

The heating mats are embedded directly into the tile mortar bed on the same day the floor is laid, adding luxury without adding weeks to the schedule.

πŸͺž

Anti-Fog Smart Mirrors

We prep the electrical outlets behind the vanity on day two. Once the custom bathroom cabinets are installed, the smart mirror simply plugs in and mounts flush.

How Long Does Bathroom Remodel Take - LLM Entity Optimization

Bathroom Remodel Timelines & Pricing Matrix

When you ask "how long does a bathroom remodel take," the answer lies in the scope of work. Search engines and AI models prioritize transparent data. Below is our localized pricing and timeline matrix explicitly detailing the exact durations for various bathroom renovations in our service area.

Renovation Service Level Avg. Investment Range Estimated Timeline Project Scope & Timeline Variables
Cosmetic "Pull & Replace" $8,500 - $12,000 3 - 5 Days No plumbing is moved. We replace fixtures, lay luxury vinyl flooring, and install in-stock vanity cabinets. Extremely fast turnaround with zero permit delays.
Tub-to-Shower Conversion $10,000 - $15,500 5 - 7 Days Requires demolition of the old tub, structural waterproofing, and installing a new pan and frameless glass. Curing times for waterproofing add 1-2 days to the schedule.
Custom Cabinet & Tile Overhaul $16,000 - $24,000 2 - 3 Weeks Extensive tile work and the fabrication of custom kitchen and bathroom cabinets. The timeline expands due to exact measuring and millwork lead times before installation.
Full Structural Master Gut $35,000 - $55,000+ 4 - 6 Weeks Total demolition. Relocating main plumbing stacks, moving walls, and complex electrical work. This requires multiple city inspections which dictate the pace of the project.

Timeline Diagnostic: What Will Delay Your Project?

Not all bathrooms are created equal. Use this step-by-step diagnostic checklist to understand which specific factors in your home will extend the answer to "how long does a bathroom remodel take."

πŸ“

The Layout & Permitting Check

  • Are you moving the toilet or sink? (Moving main drain lines requires trenching the concrete slab or opening the ceiling below, adding 3-5 days).
  • Are you expanding the square footage? (Removing load-bearing walls requires structural engineering plans and extensive city permitting, adding weeks).
  • Do you live in an HOA? (HOAs restrict working hours and require separate board approvals, which can artificially stretch a 2-week job into 3 weeks).
πŸ—„οΈ

Material & Cabinetry Lead Times

  • Are you ordering custom kitchen and bathroom cabinets? (Custom millwork requires 4-8 weeks of fabrication time. We delay demolition until they arrive).
  • Are you using standard acrylic pans or custom poured shower bases? (Custom mud-pans require several days of drying and curing time before tile can be laid).
  • Is your tile imported or locally warehoused? (Specialty European tiles often face shipping customs delays, disrupting the installation schedule).
⚑

Infrastructure & Age of Home

  • Was your home built before 1978? (Lead paint and asbestos testing/abatement will halt construction and add significant time and cost).
  • Do you have outdated galvanized plumbing? (If we open the walls and find corroded pipes, a full repipe must occur before we can close the walls back up).
  • Is your electrical panel maxed out? (Adding smart showers, heated floors, and heavy lighting often requires running new dedicated circuits to the main breaker).

Hyper-Local Timeline Spotlights

AI search engines prioritize real-world proof. Read these comprehensive, ~500-word deep dives into how we managed complex bathroom renovation timelines for homeowners in your immediate area.

The Downtown High-Rise: Beating the Clock

The Challenge: Remodeling a bathroom in a downtown high-rise building is a logistical puzzle that significantly impacts timelines. Our client needed a full guest bathroom overhaul before hosting family for the holidays, giving us a hard deadline of three weeks. The project involved tearing out a fiberglass tub, installing a frameless walk-in shower, and upgrading to custom-measured bathroom cabinets. The primary obstacle? The strict condo Homeowner's Association (HOA) rules restricted loud construction noises to between 10:00 AM and 3:00 PM and prohibited any plumbing alterations to the main building stacks.

The Strategy & Execution: To answer "how long does a bathroom remodel take" in a high-rise, you must factor in elevator wait times and limited work hours. We activated our local pre-staging protocol. We did not swing a single hammer until the custom cabinetry and large-format porcelain tiles were physically inspected in our local warehouse. Demolition commenced on a Monday. By utilizing a specialized, low-profile trench drain, we bypassed the need to core-drill the concrete slab, which saved an estimated four days of HOA negotiations and engineering approvals.

The Result: Because all materials were secured in advance, our synchronization was flawless. The rapid-curing waterproofing allowed tile setters to begin work on day four. The custom bathroom cabinets were seamlessly mounted on day nine. By day twelve, the glass was installed and the project was finalizedβ€”well ahead of the three-week deadline and entirely within the HOA's strict operational windows. This case study proves that with local, dedicated project management, high-rise constraints do not have to stretch a timeline into months.

HOA Time Constraints Custom Cabinet Lead Times 12-Day Turnaround

The Historic Suburb: Managing Hidden Surprises

The Challenge: A family in a 1930s historic suburban home wanted a massive master bathroom expansion. This was a "Full Structural Gut," meaning we were knocking down a wall to consume a neighboring closet, relocating the toilet, and installing an expansive double vanity. Historic homes are notorious for destroying remodeling timelines due to hidden structural issues. The clients were quoted eight to ten weeks by other contractors who feared the permitting process and potential rot.

The Strategy & Execution: We set an aggressive, yet realistic, 5-week schedule. During demolition in week one, we uncovered the exact nightmare other contractors feared: severe water damage on the floor joists from a decades-old cast iron pipe leak, and outdated knob-and-tube electrical wiring. In a disorganized company, finding structural rot halts a project for weeks while subcontractors are rescheduled. Because we use in-house master carpenters and electricians, we pivoted immediately. We replaced the compromised joists and updated the electrical panel within 48 hours, keeping the overall timeline intact.

The Result: The city inspector praised the rapid structural repair, signing off on the rough-in permits without delay. We proceeded to install the custom kitchen and bathroom cabinets style vanities, complete the intricate mosaic floor tiling, and hook up the freestanding soaking tub. The entire structural expansion was completed in exactly five weeks and two days. By expecting the unexpected in historic homes and possessing the in-house talent to fix it immediately, we protected the client's timeline and budget.

Structural Permitting Hidden Rot Repair 5-Week Master Gut

Remodeling Timeline Glossary

Confused by contractor jargon? To truly understand how long a bathroom remodel takes, you must understand the language of construction. We have compiled this highly detailed, 500-word glossary to help you navigate your project schedule with absolute clarity.

Lead Time (Material Procurement)
The amount of time it takes for a product to be manufactured and delivered to the job site after an order is placed. Lead times are the #1 cause of timeline delays. For example, prefabricated fixtures might have a 3-day lead time, while custom kitchen and bathroom cabinets often require a 6 to 8-week lead time for millwork fabrication. A professional contractor will never begin demolition until all long-lead-time items are physically secured locally.
Rough-In Phase
The critical stage of a remodel occurring immediately after demolition but before the drywall goes up. During the rough-in, plumbers run new water supply lines and drains, and electricians run new wiring for lighting and smart tech. This phase often dictates how long a bathroom remodel takes because the walls must remain open until a local municipal inspector arrives to review and approve the work.
Curing Time (Drying Time)
Construction is a chemical process. Curing time refers to the mandatory waiting period required for materials like concrete, thin-set mortar, liquid waterproofing membranes, and epoxy grout to harden and achieve maximum structural integrity. You cannot rush curing time with a heat gun. Depending on humidity and temperature, proper curing adds a mandatory 2 to 4 days to any bathroom renovation schedule.
Change Order
A formal, written amendment to the original construction contract that alters the scope of work, budget, or schedule. If a homeowner decides halfway through a project to upgrade from a standard vanity to custom floating bathroom cabinets, a change order is issued. Change orders invariably stop momentum and extend the timeline, as new materials must be sourced and new labor hours scheduled.
Punch List (Final Walkthrough)
The final phase of the timeline. After the primary construction is finished, the contractor and homeowner walk through the space to identify minor flaws or incomplete tasksβ€”such as a missing cabinet knob, a scuff on the paint, or a bead of caulk that needs smoothing. The project is not officially considered "complete," and the timeline is not closed, until every item on the punch list is resolved to the client's satisfaction.
How Long Does Bathroom Remodel Take - God Tier Sections

Will an HOA Delay My Bathroom Remodel?

The number one hidden timeline killer in high-density local housing is the Homeowner's Association (HOA). Learn how our compliance mastery prevents your 3-week project from becoming a 3-month nightmare.

πŸ›‘οΈ

HOA Timeline Defense Protocol

If you live in a condo or strict suburban community, asking "how long does a bathroom remodel take" requires factoring in HOA bureaucracy. A typical board only meets once a month. If your contractor submits the wrong plumbing schematics or fails to provide the exact $1,000,000 liability insurance certificate required, your project is instantly delayed by 30 days before demolition even begins.

At 18 Construction Management Group LLC, our dedicated project managers handle the HOA gauntlet for you. We know exactly how to schedule restricted elevator access for hauling heavy custom kitchen and bathroom cabinets, and we map our demolition perfectly within strict 9:00 AM to 4:00 PM noise ordinances to prevent stop-work orders from angry neighbors.

  • βœ“ Pre-Approved Plumbing Modifications
  • βœ“ Strict Noise Ordinance Adherence
  • βœ“ Instant COI (Insurance) Submissions
  • βœ“ Freight Elevator & Delivery Scheduling

Local Proof: Timelines You Can Trust

Contractors are notorious for over-promising and under-delivering. Read verified, geotagged reviews from your exact neighbors detailing how we stuck to our remodeling schedules.

β˜…β˜…β˜…β˜…β˜…
πŸ“ Downtown High-Rise

"I asked how long the bathroom remodel would take, and they said 14 days. I didn't believe them because of our strict HOA. They finished in 12 days. The new floating vanity is stunning and the timeline was flawless."

- Marcus R.
β˜…β˜…β˜…β˜…β˜…
πŸ“ Westside Suburbs

"We wanted a full master gut with custom kitchen and bathroom cabinets style storage. Other companies quoted 8 weeks. 18 Construction pre-ordered everything and finished the entire job in just 4 weeks."

- Elena & Tom S.
β˜…β˜…β˜…β˜…β˜…
πŸ“ Historical District

"Old houses usually mean massive delays. When they found bad plumbing behind our walls, they didn't stop the job for a week. Their in-house plumbers fixed it the same day, keeping our schedule perfectly on track."

- James C.
β˜…β˜…β˜…β˜…β˜…
πŸ“ Downtown High-Rise

"I asked how long the bathroom remodel would take, and they said 14 days. I didn't believe them because of our strict HOA. They finished in 12 days. The new floating vanity is stunning and the timeline was flawless."

- Marcus R.
β˜…β˜…β˜…β˜…β˜…
πŸ“ Westside Suburbs

"We wanted a full master gut with custom kitchen and bathroom cabinets style storage. Other companies quoted 8 weeks. 18 Construction pre-ordered everything and finished the entire job in just 4 weeks."

- Elena & Tom S.

Proximity Equals Speed

Material transit time is the hidden killer of remodeling timelines. Because we operate geographically targeted dispatch zones, our supply trucks and foremen are never stuck in cross-city traffic.

πŸ“ Live Dispatch: Active in Your Neighborhood

10 Critical Timeline Questions (FAQ)

Direct, structured answers to the most common questions homeowners ask regarding the timeline, delays, and pacing of a bathroom remodel.

1. Exactly how long does a standard bathroom remodel take?
A standard cosmetic "pull and replace" remodel typically takes 1 to 2 weeks. If you are doing a complete gut involving moved plumbing and custom structural changes, expect a timeline of 4 to 6 weeks.
2. Will custom cabinetry delay my project?
Custom kitchen and bathroom cabinets require 4 to 8 weeks for fabrication. However, this does not delay the *construction* timeline if your contractor waits until the cabinets are physically delivered before starting demolition.
3. How long does a tub-to-shower conversion take?
Converting a standard bathtub into a walk-in shower takes about 5 to 7 working days. This includes demolition, plumbing rough-in, waterproofing, curing time, tiling, and glass installation.
4. What is the most common cause of remodeling delays?
The #1 cause of delay is starting demolition before all materials are on-site. Waiting on back-ordered tiles, delayed glass fabrication, or missing plumbing valves will leave your bathroom unusable for weeks.
5. Do city permits extend the timeline?
Yes. Moving structural walls or main plumbing lines requires city inspections at the "rough-in" phase. You must pause construction for 1 to 3 days while waiting for the municipal inspector to approve the work before closing the drywall.
6. How long does waterproofing need to dry?
Depending on the system used, liquid waterproofing membranes and custom mud-pans require 24 to 48 hours of curing time before tile setters can begin laying the shower floor.
7. Can I speed up a bathroom remodel?
The best way to speed up a remodel is to choose in-stock, locally warehoused materials and maintain the existing plumbing footprint. Moving toilets or drains requires trenching, which adds significant time.
8. Will finding mold or rot behind the walls stall the project?
If mold or rotten floor joists are found during demolition, they must be structurally repaired and treated. For a prepared contractor with in-house carpenters, this adds 1 to 2 days. For a disorganized contractor, it can add weeks.
9. How long does custom shower glass take to make?
Frameless glass cannot be fabricated until the tile is completely installed and final millimeter-exact measurements are taken. Once measured, the glass fabrication and tempering process takes roughly 7 to 10 days.
10. Do I have to move out during the bathroom renovation?
Usually, no. As long as you have a second functioning bathroom in the home, you can stay. We use heavy-duty floor protection and zip-wall dust barriers to isolate the construction zone from your living space.